Trending
News

FG Suspends Lagos-Ibadan Expressway Bridge Work After 20-Hour Gridlock

The Federal Government has suspended the construction of a pedestrian bridge at the Aseese section of the Lagos-Ibadan Expressway following a traffic gridlock that stranded motorists and commuters for more than 20 hours.

Daniel Momodu · · 21
FG Suspends Lagos-Ibadan Expressway Bridge Work After 20-Hour Gridlock


The Federal Government has suspended the ongoing construction of a pedestrian bridge at the Aseese area of the Lagos-Ibadan Expressway following severe traffic congestion that left motorists stranded for more than 20 hours.

The construction, being handled by the Federal Ministry of Works in collaboration with CBC Construction Company, was scheduled to run from November 18 to 22 to facilitate the installation of the pedestrian bridge.

The Ogun State Traffic Compliance and Enforcement Agency (TRACE) had earlier announced a temporary diversion of traffic approaching Lagos, directing motorists towards the Lagos carriageway at Aseese before rejoining their normal route at a designated exit opposite Christ Embassy.

However, the diversion triggered a prolonged gridlock that began at about 2pm on Wednesday and continued until approximately noon on Thursday.

Several motorists and commuters were stranded for hours, while many abandoned their vehicles and trekked considerable distances to reach their destinations.

Some passengers travelling from Ibadan shortly after 11am on Wednesday reportedly arrived in Magboro, Ogun State, at about 5.30pm. Another motorist said he spent approximately eight hours travelling from Mowe to Magboro.

The situation also created opportunities for commercial transport operators to increase their fares significantly. Some motorcycle operators reportedly charged as much as ₦6,000 for journeys from Mowe to Ibafo.

Other motorists resorted to driving against traffic in attempts to escape the congestion, further worsening the situation along the busy corridor.

The prolonged disruption attracted criticism from the Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, who questioned the decision to carry out the construction during peak traffic hours.

Dare, who was travelling from Lagos to Ibadan ahead of the APC presidential rally scheduled for Saturday, said he had spent more than five hours in the gridlock.

He criticised the contractor for choosing to undertake the work during the busiest period rather than at night when vehicular movement was considerably lower.

He also expressed concern that thousands of commuters had been forced to abandon their vehicles and trek to their destinations.

Following the development, TRACE announced the indefinite suspension of the construction-related traffic diversion pending further directives from the relevant authorities.

The agency's spokesperson, Babatunde Akinbiyi, said the decision was taken after reviewing the traffic challenges experienced along the expressway.

He apologised to motorists and other road users for the inconvenience, delays and discomfort caused by the diversion, while appreciating their patience and cooperation.

Similarly, the Acting Controller of the Federal Ministry of Works in Ogun State, Richard Adeleye, confirmed that the construction had been suspended because of the traffic situation.

When contacted, Adeleye simply stated that the work was halted due to the congestion.

Meanwhile, some commuters called on the Ogun State Government to rehabilitate inner roads connecting communities along the expressway, arguing that functional alternative routes would reduce the impact of traffic disruptions during major construction projects.

A commuter, Kunle Adeleke, said properly maintained internal roads would have provided motorists with alternative routes during the gridlock.

Another road user, Jamiu Akinsola, urged the Federal Government to strengthen its supervision of contractors handling major infrastructure projects to prevent similar disruptions.

He stressed that although infrastructure development was necessary, the welfare and convenience of citizens should be considered when scheduling construction activities.


Sponsored

Sponsored content
Share this story

Comments (0)

  1. Be the first to share your thoughts.

Leave a comment

All comments are moderated before publishing. Your email is never published.

Not published.

Related stories